• Construction works of the public water system and sewage facilities and district heating pipelines

Customer: Saku Maja AS

Task: Along with the water and sewage systems, works were also carried out in the district heating grid.

  • Construction works of the public water supply system and sewage facilities of the Saku III region

Customer: Saku Maja AS

Task: Construction works connected with drinking water, sewage and drainage pipelines

  • Construction of the waste-water pumping station of Leeriku

Customer: Elveso AS

Task: A new waste-water pumping station was built.

  • Design and construction works of water and sewage plumbing in the village of Rahinge

Customer: Emajõe Veevärk AS

Task: Construction of pressurised and self-flowing water and sewage pipelines using the no-dig method.

  • Second stage of the reconstruction of water and sewage systems in Elva

Customer: Emajõe Veevärk AS

Task: Construction of water supply pipelines; self-flowing and pressurised waste-water plumbing; pumping stations and fire hydrants in the Mahlamäe district; and the region between Vallavere tee and Lohu tänav.

  • Partial reconstruction of the district heating network in the town of Jüri

Customer: Elveso AS

Task: Reconstruction of district heating pipelines.

  • Design and construction of the waste-water treatment system in Võru

Customer: AS Võru Vesi

Task: A new waste-water treatment system was designed and built for the town of Võru, and a remote operation system for water treatment was created

Waste-water treatment system in Võru
Link