Vaivara hazardous waste treatment centre

Customer: Environment Agency

Task: Design and construction works required for and related to the installation of the drainage water and contaminated rainwater purification equipment at Vaivara Hazardous Waste Treatment Centre.

Design and construction works required for the installation of the drainage water and contaminated rainwater purification equipment in the only hazardous-waste treatment centre in Estonia; building pumping stations and piping systems. As a result of the works carried out, the purified waste-water now complies with all existing environmental regulations.

Completed: 2015