Customer: Rakvere Vesi AS
Task: Design and construction works for the reconstruction of the waste-water treatment plant in Rakvere – waste-water treatment system; reconstruction of equipment and facilities for pre-purification; mechanical purification; and biological purification systems. Among other things, the sludge tanks and sludge processing system were reconstructed. The installation of new equipment increased the efficiency of the waste-water treatment system.
Completed: 2013